Back charges

What the builder says we owe them — damage, cleaning, standby, delay. Every one needs a documented response before it gets deducted from a claim.

Back charges raised
4
Last 90 days
Currently disputed
A$13,600
2 claims with a response lodged
Accepted
A$1,850
Offset against a claim
Withdrawn
A$6,800
Recovered by having the paperwork
Total raised against us
A$22,250
Across 4 jobs
DateJobHead contractorDescriptionAmountStatusOur response
8 Jul 2026Northbridge Health Precinct Stage 2Stanton Reid ConstructionsBuilder's clean — alleged debris left in Level 2 ceiling spaceA$4,200DisputedPhotos taken at handover of the area show it clear. Response and photo pack issued 10 July.
30 Jun 2026Waverton Public School UpgradeDelmore ProjectsDamage to plasterboard during conduit re-route in Block AA$1,850AcceptedAccepted. Offset against WAV-04.
17 Jun 2026Lidcombe Distribution Centre Stage 1Ashfield BellCrane standby time — alleged late arrival of switchboardA$6,800WithdrawnDelivery docket showed on-time arrival. Ashfield Bell withdrew 24 June.
29 May 2026Marsden Industrial Estate Building CStanton Reid ConstructionsProgramme delay claim — 3 days on the switchboard installA$9,400DisputedDelay caused by RFI-051 remaining unanswered for 19 days. EOT lodged in response.

Why this screen exists

A back charge that goes unanswered gets deducted from the next payment schedule and becomes very hard to argue about afterwards. The crane standby charge on Lidcombe was withdrawn because the delivery docket was on file within a day. That single document was worth A$6,800.